Problem statement
With the accelerating deployment of both intermittent (PV) and dispatchable distributed energy resources (battery storage, smart loads and electric vehicles), costly distribution upgrades to avoid grid violations are inevitable without strategic planning. By analyzing current and evolving grid conditions, targeted actions can be taken to avoid distribution system upgrades while embracing an increasing number of DERs.
Questions the feeder-level analysis answers
- Can we identify strategic locations to install battery storage or other devices (utility assets) where PV penetration is high or causes problems?
- Can we identify strategic locations for incentivizing or implementing EV charging stations that would not trigger distribution upgrades (utility or customer assets)?
- Where in the distribution grid do we want to encourage behind-the-meter (customer) assets?
- Are there future customer programs that can be developed?
Target: programmatic analysis of multiple substations and feeders
- Includes only the distribution network, not the transmission or sub-transmission level.
- More than 800 candidate distribution substations are under consideration for evaluation in both the peninsular and the new Gulf regions.
- Both behind-the-meter (BTM) and front-of-the-meter (FTM) DER assets may be taken into consideration.
DER integration scope
- Photovoltaic systems
- Battery storage systems
- EV chargers (uni- and bi-directional)
- Dispatchable loads
Objectives and expected outcomes
- Provide a simple road map based on proven methods and metrics for streamlined DER selection and integration into the electric power grid. Expected outcome: less time spent determining optimal locations and sizing for future DER deployments.
- Project the impacts of integrating large numbers of DERs in various locations and sizes for all possible scenarios through rigorous analysis. Expected outcome: increased confidence and trust, and reduced risk during DER project lifetimes.
- Deliver quantitative recommendations for potential future DER deployments for accelerated integration. Expected outcome: greater potential for integrated DERs in FPL’s fleet, leading to a larger renewable portfolio.